Childcare Centre

Childcare Centres require specialist traffic engineering advice to ensure the car park design is provided in a safe manner given the sites accommodate vulnerable road users. The team at Amber have extensive experience with the preparation of Traffic Impact Assessment for childcare centres which ensures we are always designing with safety and efficiency in mind.

A key consideration of childcare centres is the parking provision to ensure there are minimal impacts in the surrounding area. We have parking survey data from a wide variety of sites which ensures we are able to provide accurate advice when determining how many parking spaces to provide on-site.

Our senior team regularly provide traffic expert witness services to VCAT and are experienced traffic consultants in the childcare centre space.

Newport Childcare Centre

One of our Directors recently presented as an expert witness for the 84-place childcare centre located on Maddox Road in Newport. The site is located next to a primary school which resulted in the road network being congested during peak school times. We undertook traffic surveys within the vicinity of the site and prepared a traffic modelling assessment using SIDRA to confirm that the vehicle movements from the childcare centre could be accommodated on the road network.

Drouin Childcare Centre

Amber Organisation staff prepare a Traffic Impact Assessment for the 118 place childcare centre located in regional Victoria. Key considerations included the provision of car parking against the requirements of the Planning Scheme and the design of the car park to ensure it operates in a safe and efficient manner. Our Director also provided expert witness services to VCAT to support the development.

Ringwood Childcare Centre

Amber Organisation assisted with the preparation of a Traffic Impact Assessment report for a proposed childcare centre in Ringwood. The project involved the consolidation of two lots and in order to provide suitable access, a bus stop and street tree were required to be relocated.

Amber were able to arrange an on-site meeting with state and local government officers to facilitate the necessary changes to the infrastructure to provide clarity and comfort to the project team.

Viewbank Childcare Centre

Amber has completed a Traffic Impact Assessment report for the childcare centre in Viewbank which is expected to accommodate 128 children. The project proposes to accommodate all car parking within a basement level. We provided design advice and a swept path assessment to ensure the car park is suitably design in accordance with the Planning Scheme. Childcare centres are often accessed via large vehicles associated with parents and need to be provided with additional space to ensure they are useable and provide a safe environment.

Traffic impact assessment services icon - Amber Org

Traffic Assessments

Parking Requirement and Design icon - Amber Org

Parking & Design

Intersection modelling icon - Amber Org

Intersection Modelling

Constructuction Permit Expert Witness Icon - Amber Org

Expert Witness

Road infrastructure geometric design icon - Amber Org

Geometric Design

Construction Traffic management icon - Amber Org

Traffic Management Plans

Wind and solar farms traffic studies or documentation icons - Amber Org

Renewable Energy

Construction and development master plans icon - Amber Org

Master Plans

Amber Organisation Logo & Tagline - Traffic Engineers and Transportation Planners

Amber Organisation acknowledges the Traditional Owners of Country throughout Australia and recognises the continuing connection to lands, waters and communities. We pay our respect to Aboriginal and Torres Strait Islander cultures; and to Elders past and present.

Talk to an expert

We're here to help and answer any questions you might have.
We look forward to hearing from you.

Email:    info@amberorg.com.au

Phone:   1800 022 363

Visit us on LinkedIn